This page shows the details for a Demolition Case.
Case No: 10-069 Amendment: 0 Emergency: NO | Date Received: 3/3/2010 |
Building Name: | Date Posted: |
SWCAA Staff: | Date Paid: 3/5/2010 |
Site Address: 12795 US Hwy 12 Packwood, WA 98361 LEWIS COUNTY |
|
Facility Type: Garage/Workshop | Building Size: 1400 |
Prior Use: Miscellaneous | Present Use: Vacant |
# Floors: 1 | Building Age: 50 |
Demolition Method: Tear down wood walls & roof. Load w/excavator on to dump truck. Dump at Lewis County Transfer Station. | |
Emission Prevention: No visible asbestos on site | |
ACM Procedures: Masked workers to cover site with tarp | |
Comments: 10 day notification waived by Gerry, also approved w/out survey based on pictures. |
Demolition Contractor: Ashe Construction | |
AHERA Company: | |
Property Owner: Cheney, Gene PO Box 164 Packwood, WA 98361 |
Submitted by: Randy Jones - | Representing: |
Email: | Phone No.: |