This page shows the details for a Demolition Case.
Case No: 11-031 Amendment: 0 Emergency: NO | Date Received: 1/24/2011 |
Building Name: | Date Posted: |
SWCAA Staff: | Date Paid: 1/27/2011 |
Site Address: 1101 S Scheuber Rd Centralia, WA 98531 LEWIS COUNTY |
|
Facility Type: Residential | Building Size: 1200 |
Prior Use: Residence | Present Use: Vacant |
# Floors: 1 | Building Age: 60 |
Demolition Method: Load into refuge containers with excavator | |
Emission Prevention: | |
ACM Procedures: | |
Comments: Have survey |
Demolition Contractor: Scherer Trucking & Excavation | |
AHERA Company: | |
Property Owner: The Foster Group 1526 NE Alberta St #125 Portland, OR 97211 |
Submitted by: Jeffrey Scherer - | Representing: |
Email: | Phone No.: |