This page shows the details for a Demolition Case.
Case No: 13-111 Amendment: 0 Emergency: NO | Date Received: 3/20/2013 |
Building Name: | Date Posted: |
SWCAA Staff: | Date Paid: 5/8/2013 |
Site Address: 8415 NE 219th St Battle Ground, WA 98604 CLARK COUNTY |
|
Facility Type: Residential | Building Size: 1100 |
Prior Use: Residence | Present Use: Residence |
# Floors: 1 | Building Age: 30 |
Demolition Method: Tear down house with excavator and haul out debris | |
Emission Prevention: | |
ACM Procedures: |
Demolition Contractor: Correctional Industries Environmental | |
AHERA Company: Mel Hartsell | |
Property Owner: WA Dept. of Transportation PO Box 1709 Vancouver, WA 98668 |
Submitted by: Gary Baldwin - | Representing: |
Email: | Phone No.: |