This page shows the details for a Demolition Case.
Case No: 23-429 Amendment: 0 Emergency: NO | Date Received: 6/27/2023 |
Building Name: Drax Pellet Plant | Date Posted: 6/27/2023 |
SWCAA Staff: Stephanie Hungerford | Date Paid: 6/27/2023 |
Site Address: 175 E Mill Rd Longview, WA 98632 COWLITZ COUNTY |
|
Facility Type: Industrial | Building Size: |
Prior Use: Industrial | Present Use: Vacant |
# Floors: | Building Age: |
Demolition Method: Machine demolition and wood structure demolition with the application of water for fugitive dust emissions. Debris will be segregated, processed, and loaded out for proper disposal or recycle. | |
Emission Prevention: | |
ACM Procedures: No asbestos was found. All hazardous & universal waste materials present will be characterized, quantified, and removed prior to the start of demolition by a licensed & insured abatement company. | |
Comments: Ascendent Demo will be conducting the demolition, subcontracted by JH Kelly, who is the General Contractor on the project. The demolition aspect will clear existing buildings from site so that the Pellet Plant may be built. |
Demolition Contractor: Ascendent Demo LLC | |
AHERA Company: Pacific Rim Environmental (Kyle Lewis, Paul Thompson) | |
Property Owner: Pinnacle Renewable Holdings Inc , |
Submitted by: Jordan Stewart - Project Engineer | Representing: Drax |
Email: jordan.stewart@drax.com | Phone No.: |