This page shows the details for a Demolition Case.
Case No: 24-100 Amendment: 0 Emergency: NO | Date Received: 2/16/2024 7:45:33 AM |
Building Name: Manufactured home | Date Posted: 2/16/2024 |
SWCAA Staff: Danielle Kreps | Date Paid: 2/16/2024 |
Site Address: 131 State Route 122 #12 Mossyrock, WA 98564 LEWIS COUNTY |
|
Facility Type: Residential | Building Size: |
Prior Use: Residence | Present Use: Vacant |
# Floors: | Building Age: |
Demolition Method: Full demolition of manufactured home shell using excavator. Will cute up and remove the metal frame as well. Will have dumpsters on site. | |
Emission Prevention: All piping will be disconnected prior to demolition, any metal storage tanks, water heaters, propane tanks, etc are being removed by owner prior to demolition | |
ACM Procedures: | |
Comments: Owner is having all utilities capped and turned off prior to demolition. Windows removed prior to demolition. No contents inside manufactured home shell. |
Demolition Contractor: Down to Earth Land Services LLC | |
AHERA Company: Sam Neher | |
Property Owner: Karen Pulju , |
Submitted by: Sam Neher - Owner | Representing: Down to Earth Land Services LLC |
Email: samneher@yahoo.com | Phone No.: |