This page shows the details for a Demolition Case.
Case No: 24-144 Amendment: 0 Emergency: NO | Date Received: 3/8/2024 12:25:36 PM |
Building Name: Manufactured home | Date Posted: 3/8/2024 |
SWCAA Staff: Stephanie Hungerford | Date Paid: 3/8/2024 |
Site Address: 318 South Maple Hill Rd 314 South Maple Hill RD Kelso, WA 98626 COWLITZ COUNTY |
|
Facility Type: Residential | Building Size: |
Prior Use: Residence | Present Use: Vacant |
# Floors: | Building Age: |
Demolition Method: This project includes total demolition of manufactured home. The home is approximately 720 square feet. The structure is a single level built with wood structure interior has wall paneling and the exterior is aluminum. The project will be done with excavator recycling as much of building as possible. | |
Emission Prevention: During demolition, water will be used to wet down area that is being demolished prior to starting demolition. During the demolition process water will be used to minimize the fugitive particle emissions. The ground will be sprayed with water to minimize fugitive emissions while debris are removed from project. | |
ACM Procedures: Asbestos was completely removed prior to this demolition project. | |
Comments: No comments at this time |
Demolition Contractor: AEC | |
AHERA Company: Joel Dillard | |
Property Owner: Keith Livezey , |
Submitted by: Megan Marie Livezey - Owners daughter | Representing: Keith Livezey |
Email: megster_216@hotmail.com | Phone No.: |