This page shows the details for a Demolition Case.
Case No: 24-244 Amendment: 0 Emergency: NO | Date Received: 4/16/2024 5:17:09 PM |
Building Name: BNSF Castle Rock | Date Posted: 4/16/2024 |
SWCAA Staff: Stephanie Hungerford | Date Paid: 4/16/2024 |
Site Address: 46.254813, -122.849881 46.254813, -122.849881 Castle Rock, WA 98611 COWLITZ COUNTY |
|
Facility Type: Commercial | Building Size: |
Prior Use: Miscellaneous | Present Use: Miscellaneous |
# Floors: | Building Age: |
Demolition Method: Manually remove vermiculite by opening up the bottom of the block to flush out as much as possible into a vacuumn. Once the flow slows down, IRS plan to use a small excavator to remove the blocks while flushing more vermiculite out of the cinder block | |
Emission Prevention: Wet methods during removal | |
ACM Procedures: <=1% vermiculte | |
Comments: This is not an abatement project. But acm is presence so BNSF, wants an abatement contractor to handle this as opposed to a demo contractor. |
Demolition Contractor: IRS Environmental of Portland, Inc. | |
AHERA Company: Dallas Meck | |
Property Owner: BNSF , |
Submitted by: Nancy Nguyen - CEO | Representing: IRS Environmental of Portland, Inc |
Email: Nancy@IRSEnvironmental.com | Phone No.: |