Demolition Case Details

This page shows the details for a Demolition Case.

CASE

Case No: 24-244   Amendment: 1    Emergency: NO Date Received: 4/29/2024
Building Name: BNSF Castle Rock Date Posted: 4/16/2024
SWCAA Staff: Stephanie Hungerford Date Paid: 4/16/2024

SITE INFORMATION

Site Address:
   18727 E Laberry Dr
   46.254813, -122.849881
   Castle Rock, WA 99016
   COWLITZ COUNTY
Facility Type: Commercial Building Size:
Prior Use: Miscellaneous Present Use: Miscellaneous
# Floors: Building Age:

PROJECT

Demolition Method: Manually remove vermiculite by opening up the bottom of the block to flush out as much as possible into a vacuumn. Once the flow slows down, IRS plan to use a small excavator to remove the blocks while flushing more vermiculite out of the cinder block
Emission Prevention: Wet methods during removal
ACM Procedures: <=1% vermiculte
Comments: Need to push end date out by another day

CONTRACTORS/OWNER

Demolition Contractor: IRS Environmental of Portland, Inc.
AHERA Company:  Dallas Meck
Property Owner: BNSF
   
   ,  

SIGNATURE

Submitted by: Nancy Nguyen - CEO Representing: IRS Environmental of Portland, Inc
Email: Nancy@IRSEnvironmental.com Phone No.: