This page shows the details for a Demolition Case.
Case No: 24-273 Amendment: 0 Emergency: NO | Date Received: 4/25/2024 5:04:18 PM |
Building Name: Drax Pellet Plant | Date Posted: 4/25/2024 |
SWCAA Staff: | Date Paid: 4/25/2024 |
Site Address: 125 E Mill Rd n/a Longview, WA 98632 COWLITZ COUNTY |
|
Facility Type: Industrial | Building Size: |
Prior Use: Industrial | Present Use: Vacant |
# Floors: | Building Age: |
Demolition Method: Wood structure demo. Excavator. Water for fugitive dust emissions. | |
Emission Prevention: Application of water in a spray or mist to knock down fugitive dust emissions as needed. Water will be applied in such a manner to minimize potential for pooling or runoff. | |
ACM Procedures: All hazardous/universal waste materials present will be characterized, quantified, and removed prior to the start of demo by a licensed and insured abatement company. | |
Comments: Demolition of existing green wood structure that are no longer in use and no longer needed. |
Demolition Contractor: Ascendent LLC | |
AHERA Company: Kyle Lewis | |
Property Owner: Pinnacle Renewable Holdings Inc. , |
Submitted by: Jordan Stewart - Project Engineer | Representing: Drax |
Email: jordan.stewart@drax.com | Phone No.: |