This page shows the details for a Demolition Case.
Case No: 25-059 Amendment: 0 Emergency: NO | Date Received: 1/17/2025 5:07:16 PM |
Building Name: Majestic Steel | Date Posted: 1/17/2025 |
SWCAA Staff: Stephanie Hungerford | Date Paid: 1/17/2025 |
Site Address: 850 3rd Avenue Longview, WA 98362 CLARK COUNTY |
|
Facility Type: Industrial | Building Size: |
Prior Use: Industrial | Present Use: Vacant |
# Floors: | Building Age: |
Demolition Method: Full Demolition & Abatement Work Plan shall be Submitted to Brian Fallon & Tina After submission of this Notification describing demolition and abatement means and methods. This is because abatement and demolition will happen concurrently due to nature of project. | |
Emission Prevention: Dust Control Via Fire Hose attached to Hydrant or Dust Suppression Cannon as needed. Majority of Dust Generating demolition shall be done indoors prior to Exterior shell removal. | |
ACM Procedures: Non-Friable asbestos Likely completed prior to demolition within Regulated Area using wet, manual methods and critical barriers. Friable roofing and GWB removal performed in NPE if performed indoors. Roofing may be left in place until final building skin removal and be performed as an outdoor abatement using manual wet methods to control fiber release. Exterior Area monitoring performed if this is the case. Ref. Work plan for additional information. | |
Comments: Please see emailed Asbestos & Demolition work plan for this project |
Demolition Contractor: Ascendent Demolition LLC | |
AHERA Company: PBS Environmental - Douglas Hancock | |
Property Owner: JH Kelly 200 Grand Blvd Vancouver, WA 98661 |
Submitted by: Mike Estes - Project Manager | Representing: Ascendent LLC |
Email: Mestes@ascdemo.com | Phone No.: |