Demolition Case Details

This page shows the details for a Demolition Case.

CASE

Case No: 25-059   Amendment: 0    Emergency: NO Date Received: 1/17/2025 5:07:16 PM
Building Name: Majestic Steel Date Posted: 1/17/2025
SWCAA Staff: Stephanie Hungerford Date Paid: 1/17/2025

SITE INFORMATION

Site Address:
   850 3rd Avenue
   Longview, WA 98362
   CLARK COUNTY
Facility Type: Industrial Building Size:
Prior Use: Industrial Present Use: Vacant
# Floors: Building Age:

PROJECT

Demolition Method: Full Demolition & Abatement Work Plan shall be Submitted to Brian Fallon & Tina After submission of this Notification describing demolition and abatement means and methods. This is because abatement and demolition will happen concurrently due to nature of project.
Emission Prevention: Dust Control Via Fire Hose attached to Hydrant or Dust Suppression Cannon as needed. Majority of Dust Generating demolition shall be done indoors prior to Exterior shell removal.
ACM Procedures: Non-Friable asbestos Likely completed prior to demolition within Regulated Area using wet, manual methods and critical barriers. Friable roofing and GWB removal performed in NPE if performed indoors. Roofing may be left in place until final building skin removal and be performed as an outdoor abatement using manual wet methods to control fiber release. Exterior Area monitoring performed if this is the case. Ref. Work plan for additional information.
Comments: Please see emailed Asbestos & Demolition work plan for this project

CONTRACTORS/OWNER

Demolition Contractor: Ascendent Demolition LLC
AHERA Company:  PBS Environmental - Douglas Hancock
Property Owner: JH Kelly
   200 Grand Blvd
   Vancouver, WA 98661

SIGNATURE

Submitted by: Mike Estes - Project Manager Representing: Ascendent LLC
Email: Mestes@ascdemo.com Phone No.: